NPC “Ukrenergo” (Ukraine)

#4
TOTAL VERIFIED CUTS IN THIS SECTOR AMOUNTS TO – 9 119 225 t CO2

Power transmission

NPC “Ukrenergo” (Ukraine)
PJSC “PC “Zhytomyroblenergo” (Ukraine)
OJSC “Odesaoblenergo” (Ukraine)
PJSC “PC “Sevastopolenergo” (Ukraine)
PJSC “PC “Khersonoblenergo” (Ukraine)
PJSC “Kirovogradoblenergo” (Ukraine)

Power transmission

Reconstruction and Modernization of Main-line Electrical Grids of NPC “Ukrenergo”

ERUs

2 015 268

Power transmission

The purpose of the project is the implementation of methodological, organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.

Details of events/modernization:

  1. Installation of transformers, pcs.: 15.
  2. Installation of switches, pcs.: 132.
  3. Installation of insulators, pcs.: 25891.
  4. Organizational measures of methodological support.

Power transmission

Modernization of Electric Power Distribution System at PJSC "PC "Zhytomyroblenergo"

ERUs

810 906

Power transmission

The purpose of the project is the implementation of organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.

Details of events/modernization:

  1. Implementation of new or reconstructed existing wires of power transmission lines, km: 548,526.
  2. Replacement of power line insulators, pcs.: 17272.
  3. Replacement of signal lamps with LED ones, pcs.: 3000.
  4. Implementation of reactive power compensation devices for the consumer, power, kW: 525.
  5. Replacement of electricity meters, pcs.: 136599.
  6. Replacement of oil circuit breakers with vacuum and SF6 circuit breakers, pcs.: 143.
  7. Implementation of new or reconstructed existing electric motors for blast cooling of power transformers, pcs.: 62.
  8. Implementation of new or reconstructed existing branches, km: 0.51.
  9. Reconstruction of existing sections of electrical networks, pieces: 20.
  10. Implementation of new or reconstructed existing two-winding transformers 157.
  11. Implementation of new or reconstructed existing wires of power transmission lines, km: 9.6.

Power transmission

Modernization of Electric Power Distribution System at OJSC "Odesaoblenergo"

ERUs

2 373 077

Power transmission

The purpose of the project is the implementation of organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.

Details of events/modernization:

  1. Implementation of new or reconstructed existing wires of power transmission lines, km: 278.25.
  2. Replacement of insulators for power lines, pcs.: 43532.
  3. Replacement of signal lamps with LED ones, pcs.: 1235.
  4. Implementation of reactive power compensation devices for the consumer, power, kW: 1600.
  5. Replacement of electricity meters, pcs. 357199
  6. Replacement of oil circuit breakers with vacuum and SF6 circuit breakers, pcs. 383
  7. Implementation of new or reconstruction of existing electric motors for blast cooling of power transformers, pcs. 0.075
  8. Implementation of new or reconstructed existing branches, km 44
  9. Reconstruction of existing sections of electrical networks, pcs. fifty
  10. Implementation of new or reconstructed existing two-winding transformers 133.54.

Power transmission

Modernization of Electric Power Distribution System at PJSC "PC "Sevastopolenergo"

ERUs

218 408

Power transmission

The purpose of the project is the implementation of organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.

Details of events/modernization:

  1. Implementation of new or reconstructed existing wires of power transmission lines, km 278.25.
  2. Replacement of power line insulators, pcs.: 3211.
  3. Replacement of signal lamps with LED ones, pcs.: 1200.
  4. Implementation of reactive power compensation devices for the consumer, power, kW: 59541.
  5. Replacement of electricity meters, pcs. 33.
  6. Replacement of oil circuit breakers with vacuum and SF6 circuit breakers, pcs.: 5.
  7. Implementation of new or reconstructed existing two-winding transformers 4 blocks.

Power transmission

Modernization of Electric Power Distribution System at PJSC "PC "Khersonoblenergo"

ERUs

1 899 459

Power transmission

The purpose of the project is the implementation of organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.

Details of events/modernization:

  1. Introduction of new or reconstruction of existing wires of power lines, km: 1960.39.
  2. Replacement of power line insulators, pcs.: 16165.
  3. Replacement of signal lamps with LED ones, pcs.: 790.
  4. Implementation of reactive power compensation devices for the consumer, power, kW: 950.
  5. Replacement of electricity meters, pcs.: 106473.
  6. Replacement of oil circuit breakers with vacuum and SF6 circuit breakers, pcs.: 113.
  7. Implementation of new or reconstructed existing electric motors for blast cooling of power transformers, pcs.: 94.
  8. Implementation of new or reconstructed existing branches, km: 0.28.
  9. Reconstruction of existing sections of electrical networks, pcs.: 25.
  10. Implementation of new or reconstructed existing two-winding transformers: 83.

Power transmission

Modernization of Electric Power Distribution System at PJSC "Kirovogradoblenergo"

ERUs

1 802 107

The purpose of the project is the implementation of organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.

 

Details of events/modernization:

  1. Implementation of new or reconstructed existing wires of power transmission lines, km: 1185.79.
  2. Replacement of insulators for power lines, pcs: 36360.
  3. Replacement of signal lamps with LED ones, pcs: 790.
  4. Implementation of reactive power compensation devices for the consumer, power, kW: 1725.
  5. Replacement of electricity meters, pcs.: 70800.
  6. Replacement of oil circuit breakers with vacuum and SF6 circuit breakers, pcs.: 115.
  7. Implementation of new or reconstructed existing electric motors with blast cooling of power transformers blast cooling, pcs.: 94.
  8. Implementation of new or reconstructed existing branches, km: 0.387.
  9. Reconstructed existing sections of electrical networks, pieces: 27.

We are happy to answer your questions