#4
TOTAL VERIFIED CUTS IN THIS SECTOR AMOUNTS TO – 9 119 225 t CO2
Power transmission
Power transmission
Reconstruction and Modernization of Main-line Electrical Grids of NPC “Ukrenergo”
Power transmission
The purpose of the project is the implementation of methodological, organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.
Details of events/modernization:
- Installation of transformers, pcs.: 15.
- Installation of switches, pcs.: 132.
- Installation of insulators, pcs.: 25891.
- Organizational measures of methodological support.
Power transmission
Modernization of Electric Power Distribution System at PJSC "PC "Zhytomyroblenergo"
Power transmission
The purpose of the project is the implementation of organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.
Details of events/modernization:
- Implementation of new or reconstructed existing wires of power transmission lines, km: 548,526.
- Replacement of power line insulators, pcs.: 17272.
- Replacement of signal lamps with LED ones, pcs.: 3000.
- Implementation of reactive power compensation devices for the consumer, power, kW: 525.
- Replacement of electricity meters, pcs.: 136599.
- Replacement of oil circuit breakers with vacuum and SF6 circuit breakers, pcs.: 143.
- Implementation of new or reconstructed existing electric motors for blast cooling of power transformers, pcs.: 62.
- Implementation of new or reconstructed existing branches, km: 0.51.
- Reconstruction of existing sections of electrical networks, pieces: 20.
- Implementation of new or reconstructed existing two-winding transformers 157.
- Implementation of new or reconstructed existing wires of power transmission lines, km: 9.6.
Power transmission
Modernization of Electric Power Distribution System at OJSC "Odesaoblenergo"
Power transmission
The purpose of the project is the implementation of organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.
Details of events/modernization:
- Implementation of new or reconstructed existing wires of power transmission lines, km: 278.25.
- Replacement of insulators for power lines, pcs.: 43532.
- Replacement of signal lamps with LED ones, pcs.: 1235.
- Implementation of reactive power compensation devices for the consumer, power, kW: 1600.
- Replacement of electricity meters, pcs. 357199
- Replacement of oil circuit breakers with vacuum and SF6 circuit breakers, pcs. 383
- Implementation of new or reconstruction of existing electric motors for blast cooling of power transformers, pcs. 0.075
- Implementation of new or reconstructed existing branches, km 44
- Reconstruction of existing sections of electrical networks, pcs. fifty
- Implementation of new or reconstructed existing two-winding transformers 133.54.
Power transmission
Modernization of Electric Power Distribution System at PJSC "PC "Sevastopolenergo"
Power transmission
The purpose of the project is the implementation of organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.
Details of events/modernization:
- Implementation of new or reconstructed existing wires of power transmission lines, km 278.25.
- Replacement of power line insulators, pcs.: 3211.
- Replacement of signal lamps with LED ones, pcs.: 1200.
- Implementation of reactive power compensation devices for the consumer, power, kW: 59541.
- Replacement of electricity meters, pcs. 33.
- Replacement of oil circuit breakers with vacuum and SF6 circuit breakers, pcs.: 5.
- Implementation of new or reconstructed existing two-winding transformers 4 blocks.
Power transmission
Modernization of Electric Power Distribution System at PJSC "PC "Khersonoblenergo"
Power transmission
The purpose of the project is the implementation of organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.
Details of events/modernization:
- Introduction of new or reconstruction of existing wires of power lines, km: 1960.39.
- Replacement of power line insulators, pcs.: 16165.
- Replacement of signal lamps with LED ones, pcs.: 790.
- Implementation of reactive power compensation devices for the consumer, power, kW: 950.
- Replacement of electricity meters, pcs.: 106473.
- Replacement of oil circuit breakers with vacuum and SF6 circuit breakers, pcs.: 113.
- Implementation of new or reconstructed existing electric motors for blast cooling of power transformers, pcs.: 94.
- Implementation of new or reconstructed existing branches, km: 0.28.
- Reconstruction of existing sections of electrical networks, pcs.: 25.
- Implementation of new or reconstructed existing two-winding transformers: 83.
Power transmission
Modernization of Electric Power Distribution System at PJSC "Kirovogradoblenergo"
The purpose of the project is the implementation of organizational, technical and technical measures aimed at eliminating electricity losses during the transportation of electricity through distribution networks.
Details of events/modernization:
- Implementation of new or reconstructed existing wires of power transmission lines, km: 1185.79.
- Replacement of insulators for power lines, pcs: 36360.
- Replacement of signal lamps with LED ones, pcs: 790.
- Implementation of reactive power compensation devices for the consumer, power, kW: 1725.
- Replacement of electricity meters, pcs.: 70800.
- Replacement of oil circuit breakers with vacuum and SF6 circuit breakers, pcs.: 115.
- Implementation of new or reconstructed existing electric motors with blast cooling of power transformers blast cooling, pcs.: 94.
- Implementation of new or reconstructed existing branches, km: 0.387.
- Reconstructed existing sections of electrical networks, pieces: 27.