“Vodokanal” MU

#8
TOTAL VERIFIED CUTS IN THIS SECTOR AMOUNTS TO – 1 528 324 t CO2

Water supply and drainage

“Vodokanal” MU
CE “Dniprovodokanal”
“Mykolayivvodokanal”
“Luganskvoda Ltd.”
“Infox Ltd.” branch “Іnfoxvodokanal”

Water supply and drainage

Development and Upgrade of District Water Supply and Disposal System in Zaporizhzhia City

ERUs

303 563

The purpose of the project is to reduce GHG emissions by upgrading the main equipment and processes and replacing existing pipelines.

Details of events/modernization:

  1. Replacement of pumping equipment (old pumps with low efficiency are replaced by pumps with efficiency of 81-89%).
  2. Optimization of the technological process of pumping water, i.e. change of operating modes of pumping units.
  3. Replacement of water supply and sanitation networks.
  4. Installation of a new block of measuring instruments.
  5. Installation of frequency regulators.

Water supply and drainage

Development and Improvement of Water Supply Systems, Drainage System and Wastewater Treatment of CE “Dniprovodokanal”

ERUs

480 916

The purpose of the project is to reduce GHG emissions by upgrading the main equipment and processes and replacing existing pipelines.

 

Details of events/modernization:

  1. Replacement and replacement of pumping equipment (old pumps with low efficiency are replaced by pumps with efficiency of 81-89%).
  2. Optimization of the technological process of pumping water, i.e. change of operating modes of pumping units.
  3. Replacement of water supply and sanitation networks.
  4. Replacement of shut-off and control valves.
  5. Installation of a new set of metering devices.
  6. Installation of frequency regulators.
  7. Modernization of air tanks.

Water supply and drainage

Development and Improvement of Water Supply System, Drainage System and Wastewater Treatment of City Communal Enterprise “Mykolayivvodokanal”

ERUs

306 782

The purpose of the project is:

Modernization and replacement of pumping equipment with the optimization of the technological process of pumping water by changing the operating modes of pumping units.

Replacement of water supply and sanitation networks, including the replacement of shut-off and control valves, with the installation of new groups of metering devices.

Modernization of water treatment technology.

 

Details of events/modernization:

  1. Replacement of pumping equipment units: 34.
  2. Replacement of water supply and sanitation networks, m: 21411.35 / 6700.17
  3. Installation of frequency regulators pcs.: 1.
  4. Modernization of pumping equipment, units: 115.
  5. Replacement of shut-off and control valves, pcs.: 115
  6. Installation of a new accounting group, units: 12.
  7. Installation of frequency regulators, pcs.: 11.
  8. Installation of frequency regulators.
  9. Modernization of air tanks.
  10. Implementation of mini hydroelectric power plants (SHPPs).

 

Water supply and drainage

Reconstruction of water supply and drainage system "Luganskvoda Ltd.

ERUs

997 939

The purpose of the project is the modernization and restoration of the system of centralized water supply and sanitation, LTD “Luganskvoda” and also, optimization of the operation of the water supply and sanitation system in terms of its energy efficiency.

 

Details of events/modernization:

  1. Refurbishment of pumping equipment, pcs.: 178
  2. Replacement pumping equipment, pcs: 296
  3. Installation of new groups of metering devices, pcs: 124
  4. Installation of automatic air valves, pcs: 58
  5. Installation of frequency regulators, pcs: 41
  6. Replacement of water supply networks, km: 69,067
  7. Optimization of technological process of pumping water, pcs.: 64
  8. Replacement of energy-intensive pumps with new highly energy-efficient ones;
  9. Optimization of the technological process of pumping water;
  10. Introduction of automatic air valves on water pipelines to reduce pressure and improve throughput;
  11. Replacement of water supply networks;
  12. Installation of new groups of metering devices;
  13. Introduction of new devices for hidden leak detection;
  14. Installation of frequency regulators.

Water supply and drainage

Development and improvement of water supply system, drainage system and wastewater treatment of "Infox Ltd." branch "Іnfoxvodokanal"

ERUs

437 063

The purpose of the project is to modernize the system of centralized water supply, sanitation, as well as wastewater treatment of Infox Ltd. Branch ” Іnfoxvodokanal ” and also, optimization of the optimal operation of the system of external water supply, sanitation, as well as water treatment and wastewater treatment.

 

Details of events/modernization:

  1. Restoration of pumping equipment, units: 1.
  2. Replacement of pumping equipment, pcs: 2.
  3. Installation of new groups of metering devices, pcs: 12.
  4. Installation of automatic air valves, pcs: 77.
  5. Installation of frequency regulators, pcs: 9.
  6. Replacement of shut-off and control valves, pcs.: 84.
  7. Replacement of water supply networks, km: 31736.4.
  8. Replacement of drainage networks, km: 968.8.
  9. Modernization of pumping equipment, pcs.: 21.
  10. Modernization of aeration systems of treatment facilities (aerotanks), unit 2.
  11. Development of operating conditions and technological parameters of the water supply and sanitation system.
  12. Development and provision to legal entities and individuals (customers) of technical conditions for water supply and sanitation of architectural objects.
  13. Construction and operation of production facilities with water intake and water treatment, treatment and pumping of wastewater;
  14. Construction and operation of water and drainage pipelines;
  15. Design, manufacture, installation, operation, maintenance of hydrometric points, manufacture, repair, testing, verification and certification of water meters;
  16. Purchase, use in the production of chlorine and other reagents (UV lamps, sodium hypochlorite) for water disinfection, construction and operation of facilities for their storage and use.

We will be glad to answer all your questions